MEPPS
VISION*SOLVE*DESIGN*DELIVER
A TRUSTED BCIN REGISTERED DESIGN FIRM
House
Small Building
Large Building
New Buildings
Interior Alterations
Extensions
Egress Plans
Fire Safety
Code Compliance
Permit Packages
​
JT Lomakin
Owner / Chief Designer
Experienced!!
A trusted BCIN Qualified, Registered and Insured Firm.
25 years of Real World CADD and field experience in
Multiple Construction Disciplines,
Structural, Architectural, Plumbing, Electrical, HVAC, Concrete Works
NEW Homes & Home additions; Cottages & Cottage additions; Garages
Experienced in providing FULL Permit Drawing packages
Permit Facilitation in several different Municipalities
Experienced in Large Building Renovations, Interior Alterations, Egress Plans, Fire Safety and Code Compliance
Experience in Concrete Formwork and Shoring design in the Heavy Civil and Commercial Industries.
Horizontal, Vertical and Elevated Concrete Forming.
Formwork design for: Bridge works, Overhangs, Abutments.
Wastewater Treatment Plants; Hydro Electric Turbines,
Intakes, Semi spirals, Draft tubes, Tailrace.
Experience includes working with 100’s of contractors on 1000’s of projects, produced 10,000+ drawings.
Prepared cycling schematics, cost estimates, sales presentations and contracts.
Provided Site inspections and on-going project management liaison with
contractor's on-site engineering teams.
Trained and experienced in Pre-Start Health and Safety Review - Racking Analysis
Working Experience with all levels of AutoCAD 14, 2000 to 2023, 3D Modelling, 3D printing
6 years experience as a College Instructor - CADD Specialist - 7 month Course.
​
Notable Projects over my Career
New York City - Freedom Tower One.
Concrete forming layouts for Elevator Cores and 5 levels underground slab and beam shoring
Wuskwatim Hydro Electric Plant
All Concrete Forming Layouts for the Intake, Semi Spiral, Powerhouse & Service building (See Pic Main page)
Toronto International Airport – Terminal 1
Concrete Overhang Shoring for 10 bridges & Terminal 1 concrete works
89 Harbour Plaza - Toronto
Concrete Forming Layout for forming and support of 48 Primary Podium Beams that would carry two 70 Storey Towers